
![]()
Quality
FAI report for each construction stage, monitors overall status of the project and ensures consistency with mass production target.
Many professional R & D personnel and project development engineers
Joint design experience with ODM and EMS, as well as provide effective DFM evaluation report.
Successfully applied for multiple patents.
Analysis and monitoring of FMEA, APQP documents.
CPK dimension check before mass production to ensure tooling and assembly directions meet the tolerance requirements.
