0
INQUIRY

Inquiry MORE+
  • Contacts *

  • Mobile *

  • Describe

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

En
  • En
  • 中文

The entire process of quality control in the injection molding workshop: zero defect management from the source to the finished product

Click: Time:2025-09-29 12:56:00

The quality of injection molded products needs to establish a full process control system, forming a closed loop from raw materials to finished products. Strict supplier access is required for raw material control. Each batch of raw materials is randomly inspected for melt index, tensile strength, and other indicators upon arrival at the factory. Moisture absorbing materials (such as PA/PET) need to be dried and injected within 4 hours.

Equipment and mold management are the hardware foundation, and each shift needs to check the hydraulic system and heating coil temperature, and calibrate sensor accuracy every quarter. In process control, temperature, pressure and other parameters are standardized through the Injection Molding Process Card, monitored in real-time by the MES system, and inspected by IPQC every hour for appearance and dimensions. The finished product inspection implements a system of full inspection of the first article and random inspection upon receipt. Unqualified products must be identified and isolated, and an 8D report analysis must be initiated. Through SPC statistical process control and weekly quality review, the product yield can be increased by more than 3%.


Copyright © 2015-2025 MySite Ltd. All Rights Reserved. 粤ICP备00000000号

Service Center
Contacts
Qrcode
Top
Service Center
Contacts
Tel
+86 0769-85841207
Working hours
Monday to Friday
E-mail
dgshangyi@126.com
Qrcode
Qrcode
Follow Us
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.